SELECT YOUR LANGUAGE
Remove parts in this order.
Remove loadspace scuff plate trim panel.
Remove C-pillar and D-pillar upper trims.
Partially remove loadspace side trim panel by removing x4 clips for access.
Disconnect 12V start up battery and remove battery bracket.
Remove the blanking grommet which is positioned in the spare wheel well in front of the 12V battery.
Raise vehicle on 4 post ramp.
Open vehicle doors and remove rocker panel moulding.
Remove the centre undershield.
Remove both side undershields.
Remove fixings and support fuel cooler to allow access.
Following the guide markings, cut the side undershield as shown.
Modify the left cover (G) as shown.
Modify the left cover (H) as shown.
Installing shields (G) and (H).
Using a 6 mm drill, drill a total of x3 holes into the side undershield where illustrated.
Using rivets (J) and washers (K), secure the shield to the side undershield.
Remove screw (I). This will be installed again later in the procedure.
Before installing the deployable side step brackets make sure the front battery cable clips are pushed up as far as possible on the location studs. This will aid the installation of the deployable side step harness when it will be installed.
Thread forming for front brackets.
Thread forming for rear brackets.
Thread forming front fixing points.
Make note of bracket positions to aid installation.
Install front brackets (C) and (E) to the vehicle using the reinforcing plate (W) and x2 bolts (B).
Install x2 bolts (B) to front brackets (C) and (E) from the inside.
Fully tighten all bolts (B) on the front brackets (C) and (E).
Install x2 bolts (B) to rear brackets (D) and (F).
Install rear brackets (D) and (F) to the vehicle using the reinforcing plate (W) and bolts (B).
Fully tighten all bolts (B) on the rear brackets (D) and (F).
Install supplied protection cover (L) on the battery cable in the illustrated position.
Install supplied protection cover (Q) to the fuel line in the illustrated position.
Install deployable side step harnesses.
Feed the wiring harness (M) through into the spare wheel well and secure the grommet (MA). Secure the harness to vehicle body where arrowed.
Route and secure the wiring harness (M) as illustrated. Secure the harness to vehicle body where arrowed.
Route and secure the wiring harness (M) as illustrated. Secure the harness to vehicle body where arrowed and connect connectors (MB and MC).
Reattach fuel cooler with fixings and inspect for leaks. Clip deployable side step harness (M) located where the solid black arrow is.
Lower vehicle.
Continue to feed the deployable side step wiring harness (M) into the spare wheel well and secure where arrowed.
Pull back left side trim panel to reveal area shown. If your vehicle already has a Trailer Module (TRM) or a Tow Bar Control Module (TBM) installed as shown then proceed to steps 30 to 33.
Place the Running Board Control Module (RBM) carrier (T) onto the existing towbar module carrier.
Place RBM (N) to module holder (T).
Attach towbar harness to RBM.
Secure harness (M) with x3 tie straps (C1) and connect connector (MD) to the RBM.
Pull back left side trim panel to reveal area shown. Install module holder (R).
Install RBM (N) to module holder.
Connect connector (MD) to the RBM.
Connect the deployable side step link harness (S).
Route and secure the link lead (S) as illustrated using x4 cable ties (C1). Then feed link harness (S) under main harness cover clips where arrowed.
Pull back right side trim panel and install towing harness (C).
Cut cable tie and release junction box from bottom clips.
Install the link lead harness (S) to the back of the rear junction box with connector pin (SD).
Reconnect rear junction box by the lower clips (a clicking sound will alert you it is securely in place), and then cable tie (C1).
Connect 30A fuse.
Connect 12V start up battery and install battery bracket.
Use the JLR approved diagnostic equipment to navigate to 'Diagnostics' section and follow the steps below.
Install fixing clips to secure left loadspace side trim panel .
Install C-pillar and D-pillar upper trims.
Install loadspace scuff plate trim panel.
Install parts in this order.
Raise the vehicle.
Install both side undershields.
Install centre undershield.
Open vehicle doors and install rocker panel moulding.
Identify the location of the fixing hole for the deployable side step shield (G) behind the front wheel arch liner. Drill one hole in the front wheel arch liners using a 5 mm drill.
Install x2 screws (I) to secure the deployable side step shield. Then install front wheels if required.
When you install the side steps (A). Make sure you correctly position in relation to the front bracket measurement as illustrated.
Secure the deployable side step (A) to the mounting brackets using x4 fixings (P).
Fully tighten x4 fixings (P).
Lower vehicle, and test function of the deployable side steps.